Rashik Home

 

Loft Floor

  • Wundaboards 20mm / 16mm MLCP 100m Max Length
  • 150mm centers
  • UFH pipework to come from 1st floor manifold
  • Heatmiser Controls NeoStat X1
  • Pump and Blend set for different finishes.
  • Cat6 to each room going from manifold, for possible future room sensing and automation

First Floor

  • Emmetti Manifold,
  • Wundaboards 20mm / 16mm MLCP 100m Max Length
  • 150mm centers
  • Heatmiser Controls NeoStat
  • Heatmiser Junction Box
  • Pump/Mixer set for different finishes. ADD SPACE for LATER
  • Manifold to boiler 5 core flex
  • Cat6 to each room going from manifold, for possible future room sensing and automation

Ground Floor

  • Emmetti Manifold,
  • Wundaboards 20mm / 16mm MLCP 100m Max Length 150mm centers
  • Heatmiser Neo Thermostat with Zone valve.
  • If multizone add Heat miser junction box, stats and actuators.
  • Pump/Mixer set for different finishes. ADD SPACE for LATER
  • Manifold to boiler 5 core flex
  • Cat6 to each room going from manifold, for possible future room sensing and automation

Boiler

  • Viessmann 100-W 19 KW 4 Pipe
  • Weather Compensation setup. Outdoor sensor and wire to go to NW / N wall.
  • De-aerator, Dirt Filter.

Cylinder

  • Viessmann 250L High Recovery coil / Heat Pump Coil 26KW or Twin Coil
  • Joule High Gain Indirect. 210/ 250L .  Short Stand Tall to compartment size.

Important:

Make note of pipework circuit length used to each manifold port.

Misc:

 

  • Wundaboards 16mm / 12mm MLCP. 60m Max length